Barbados Water Authority – Transmission Mains Replacement
Scope of Work: Mains Replacement Program, 7km of Transmission Mains (8 inch to 18 inch diameter HDPE pipe – fusion welded), Horizontal Directional Drilling & Pipe Bursting
Year: 2014
Schedule: 12 months
Client: Barbados Water Authority
Posted in Utility Installation